Kiowa County Community Meeting

Xcel Energy has submitted a Preliminary 1041 Application to Kiowa County for a permit to locate and construct Colorado’s Power Pathway facilities in the county pursuant to the Kiowa County §1041 Regulations. The Preliminary 1041 Application may be reviewed at the Kiowa County Courthouse located at 1305 Goff St., Eads, CO 81036, between August 1 and August 9. Pathway facilities proposed in Kiowa County include approximately 86 miles of new 345-kilovolt double-circuit electric transmission line and the new May Valley Substation. Pathway facilities will be constructed in segments, with approximately 22 miles of Segment 3 and 64 miles of Segment 4 proposed within Kiowa County.

You are invited to attend this Community Meeting to learn about Colorado’s Power Pathway facilities proposed in Kiowa County. Project staff will be available to provide information about the Kiowa County 1041 permit application process and answer questions. Please attend to learn about this important project and provide information about any topics we should consider as part of the 1041 permit application process.

No formal presentation is planned, so please attend at any time during the meeting. If you are unable to attend, meeting materials will be available in our library in the coming weeks.

To request translation services, please call 855-858-9037 or send us an email at least one week in advance of the meeting.

Next Steps

As we look ahead at next steps for Colorado’s Power Pathway:

  • We will determine the need for additional public meetings in areas where the preferred transmission line route has not been identified.
  • We will continue incorporating link-specific feedback throughout the routing process.
  • Engineering design work will start in segments where the preferred transmission line route has been identified.
  • The county land use permitting process is underway for Segments 1, 2, 3 and 4. There will be additional opportunities for public input during the land use permit process in each jurisdiction, including public hearings held by the counties or other local government agency.
  • Project representatives will reach out to individual landowners to discuss the preferred transmission line route and easements.

Updates will be posted in the coming weeks as routing and permitting progresses; please check back for the most up-to-date information.

Past Events

Spring 2022 Segment 5 Public Open Houses

Xcel Energy recently hosted four Segment 5 public open houses to gather feedback on revised transmission line routes and substation site locations. If you were unable to attend, meeting materials are available in our library.

Winter 2022 Public Open Houses

Xcel Energy hosted 15 public open houses in winter 2022 to provide a routing update, present revised transmission line route options and substation locations and gather feedback. Meeting materials are available in our library.

Fall 2021 Public Open Houses

Xcel Energy hosted 15 public open houses in fall 2021 open houses to provide information on potential transmission line route and substation site locations and collect feedback about Colorado’s Power Pathway. Meeting materials are available in our library.

September 2021 Virtual Routing & Siting Town Halls

Xcel Energy hosted two virtual town halls on Sept. 23, 2021, to provide information about the progress being made on Colorado’s Power Pathway, including the development of focus areas for identification of transmission line routes and substation sites. View meeting recordings in English and Español or review a copy of the meeting presentation.

June 2021 Virtual Introductory Meetings

Xcel Energy hosted three virtual introductory meetings in June 2021 to provide information about Colorado’s Power Pathway, the benefits it will bring to your community and the process used to identify the locations of the proposed transmission lines and substations. View meeting recordings in English and Español or review a copy of the meeting presentation.

Meeting announcements were placed in these local newspapers:

  • Aurora Sentinel
  • Akron News Reporter
  • Brush News Tribune
  • Burlington Record
  • Castle Pines News Press
  • Castle Rock News Press
  • Cheyenne Wells Range Ledger
  • Colorado Springs Gazette
  • Colorado Springs Independent
  • Douglas County News Press
  • Elbert County News
  • Elbert County Tribune

  • El Semanario
  • Flagler News
  • Fort Lupton Press
  • Fort Morgan Times
  • Fountain Valley News
  • Fowler Tribune
  • Greeley Tribune
  • Kiowa County Independent
  • Kiowa County Press
  • Lamar Ledger
  • La Voz Bilingue
  • Limon Leader

  • Keenesburg Lost Creek Guide
  • Monument Our Community News
  • New Falcon Herald
  • Otis Telegraph
  • Parker Chronicle
  • Plainsman Herald
  • Prowers Journal
  • Pueblo Chieftain
  • Simla Ranchland News
  • Wray Gazette
  • Yuma Pioneer
Meeting announcements were played on these local radio stations:

  • KSIR 1010 AM
  • NAB 104.1 FM
  • KTLF 90.5 FM
  • KATC 95.1 FM

  • KTHN 92.1 FM
  • KVAY 105.7 FM
  • KLMR 920 AM
  • KCSJ 590 AM

  • KCCY 96.9 FM
  • KNNG 104.7 FM
  • KNEC 100.9 FM
  • KGRE 1450 AM

Additional resources are available in our library
Ask a question or provide feedback